On Monday, 3 March, we poured the concrete floor for the garage and the
concrete slab on which our storage shed/workshop will be built. Here are
some photos of the concrete pouring process.

In previous pictures you saw the rebar tied together in the floors of the
garage and the shed in preparation for pouring concrete. Now, we're
pouring the concrete. First, a cement truck backed up to the garage and
extended the chute down which the wet cement will be poured.

In this picture, wet cement is pouring out of the truck down the
chute and one member of the concrete finishing crew is directing the chute to
spread the wet cement evenly over a portion of what soon will be the garage
floor. They pour the cement a section at a time.

In this picture the crew is working the cement that was poured in the photo
above. They are guided by two measurements: a chalk line on the side
wall and a guide pin of rebar driven into the ground in the center of the floor.
They push and pull the wet cement around until it is even with the chalk line and the
guide pin, thereby making the cement the same depth throughout the garage.

In this photo the crew has poured about half the floor. They are moving
the cement around to get the same depth throughout.
|